Logga in
Sök med AILogga in
JobbSafariLediga jobbSpotters for Datacenter Construction Sites in Gävle, Valbo, and Sandviken

Spotters for Datacenter Construction Sites in Gävle, Valbo, and Sandviken

NorthLane Group AB
3 dagar kvar

Sammanfattning

NORTHLANE is seeking Spotters for data center projects in Gävle and Sandviken. In this role, you will monitor safety on-site, identify risks, and ensure compliance with safety procedures. The position requires extended periods of standing and walking, and you must communicate effectively in English. This is a project-based fixed-term employment opportunity, primarily during daytime hours, with potential evening and weekend work.
Visa hela jobbannonsen

Jobbet i korthet

Anställningstyp

visstid

Arbetstid

heltid


Det här erbjuder vi

Project-based fixed-term employment.Work locations in Gävle and Sandviken.Daytime work with potential evening and weekend shifts.

Gävle

Ansök senast: 2026-08-31
Publicerad: 2026-08-06

Beskrivning

About the role

NORTHLANE is looking for several Spotters for datacenter projects in Gävle, Valbo, and Sandviken.

As a Spotter, you will contribute to a safe and well-organized working environment. You will work on the project site, observe ongoing activities, and identify potential risks or deviations.

Key responsibilities

Observe work activities and surrounding conditions to help maintain a safe working environment.

Identify and report risks and deviations.

Communicate clearly with work teams and contractors.

Help ensure that instructions and safety procedures are followed.

Contribute to a safe and well-organized working environment.

We are looking for someone who

Can communicate in English at work, both verbally and in writing.

Has a valid driving license and access to a car.

Can follow instructions and safety procedures.

Works well with others.

Is observant, responsible, and punctual.

Has the physical ability required to carry out the work, since the role involves extended periods of standing and walking.

Desirable but not required

Previous experience as a Spotter or in datacenter projects.

Previous experience in construction, industry, project-based work, or safety-related roles.

Employment conditions

Project-based fixed-term employment.

Work locations: Gävle, Valbo, and Sandviken.

Start date: According to agreement.

The work is mainly carried out during the daytime, but evening and weekend work may occur.

How to apply

Send your CV to:

contact@northlanegroup.eu

We are currently recruiting for several datacenter projects across Sweden. Please specify which location you are interested in when submitting your application.

For this position, please use the following email subject:

Spotter - Gävle, Valbo, and Sandviken

Applications will be reviewed, and interviews will be conducted on an ongoing basis.

Website

https://northlanegroup.eu

Ansök till tjänsten

Spotters for Datacenter Construction Sites in Gävle, Valbo, and Sandviken

3 dagar kvar
Denna arbetsplats har annonserats på Arbetsförmedlingen-tjänsten den 2026-08-06 och publicerades av Arbetsförmedlingen.

OM FÖRETAGET

NorthLane Group AB

Hittade du inte vad du letade efter?

Beskriv med dina egna ord vad du söker, precis som om du skulle förklara det för en kompis. Josi hittar jobb som matchar dig på riktigt.
Testa nu

Sök efter fler liknande jobb

Gävle

Läs också

“Nyfikenheten gör mig modig.”
Arbetsgivarvarumärke

“Nyfikenheten gör mig modig.”

Vad krävs för att bygga ett starkt arbetsgivarvarumärke? För Daniel Wägerth börjar det med nyfikenhet, modet att utmana gamla sanningar och data som visar vägen.

Lästid 5 min

Liknande jobb

Visa alla lediga jobb
Vattenfall

Projektledare till projekt inom lokalnät

Sollefteå
11/8 – tillsvidare
VAROPreem

Drifttekniker till Specialbränsledepå- Vikariat

Göteborg
17/8 – 31/8

Jobb per stad

Det är enklare än någonsin att söka jobb – men svårare än någonsin att hitta rätt. Det vill vi ändra på. JobbSafari är din guide genom arbetslivet, byggd för att matcha rätt person med rätt möjlighet bland tusentals lediga jobb i Sverige.

JobbSafari är en del av Duunitori Group – Duunitori är Finlands största jobbsökmotor och en betrodd partner inom rekrytering, rekryteringsmarknadsföring och employer branding.

Stockholm, Sweden

JobbSafari AB

Grev Turegatan 11A

114 46 Stockholm, Sweden

info@jobbsafari.se

+46 (0) 8 515 10 774

Helsinki, Finland

Duunitori Oy

Toinen Linja 7

00530 Helsinki, Finland

asiakaspalvelu@duunitori.fi

+358 44 980 3558

Oslo, Norway

JobbSafari AB

c/o Accountor AS

Tangen 75

4608 Kristiansand, Norge

info@jobbsafari.se

+46 70 314 59 79

  • jobbsafari.se
  • duunitori.fi
  • jobbsafari.no
  • allaloner.se
  • jobbland.se